Any right-in/right-out access without a median extension should be located to the south in the area where a median will be provided.
-
The analysis of any right-in/right-out access scenario should include an analysis of expected queueing for the northbound left at Banwell & Tecumseh and the southbound left at Banwell & Palmetto to confirm that the design storage length is sufficient with site traffic from the development.
-
It should be noted that the analysis done to date for the Banwell detailed design has identified concerns about the capacity of the northbound left turn movement at Banwell & Tecumseh.
-
The project manager for Banwell Phase 1 is Wadah Al-Yassiri and is the best person to contact for specifics about the Banwell design.
ENWIN UTILITIES - Hydro Engineering – Cecile Dalgleish, March 25, 2020
No Objections. ENWIN has overhead 27.6kV primary conductor on the east side of Banwell. Attached sketch for reference.
We recommend referring to the Occupational Health & Safety Act for the minimum safe limits of approach for equipment during construction.