Draft Municipal Class EA Update

Notes:

Description of the Project

Cost Limit for

Project

Schedule

A: exempt from EA requirements

A+: exempt, public notice recommended

B: limited public consultation and screening document required

C: full 5-phase process

23a Construction or removal of sidewalks or multi-purpose paths or cycling facilities within existing or protected rights-of-way and/or utility/rail corridors

No limit

A+

17 a) Construction of localized operational improvements at specific locations including roundabouts

No limit

A+

26 Installation, construction or reconstruction of traffic control devices (e.g. signing, signalization).

No limit

A+