Draft Municipal Class EA Update
Notes:
-
The table below is based on the draft Municipal Class EA major update recently released by the Ministry of the Environment, Conservation and Parks and is not yet approved.
-
Item numbering has changed between the current version and the draft major update. The ordering in the table below matches the table for the current Municipal Class EA to assist with comparing between the two tables.
-
Revisions from the text in the current version are shown as follows:
-
Deleted text: strikethough
-
Changed or added text: underline
-
Description of the Project | Cost Limit for Project | Schedule A: exempt from EA requirements A+: exempt, public notice recommended B: limited public consultation and screening document required C: full 5-phase process |
---|---|---|
23a Construction or removal of sidewalks or multi-purpose paths or cycling facilities within existing or protected rights-of-way and/or utility/rail corridors | No limit | A+ |
17 a) Construction of localized operational improvements at specific locations including roundabouts | No limit | A+ |
26 Installation, construction or reconstruction of traffic control devices (e.g. signing, signalization). | No limit | A+ |