Description of the Project Cost Limit forProject

Schedule

A: exempt from EA requirements

A+: exempt, public notice recommended

B: limited public consultation and screening document required

C: full 5-phase process

20. Reconstruction or widening where the reconstructed road or other linear paved facilities (e.g. HOV lanes will not be for the same purpose, use, capacity or at the same location (e.g. additional motor vehicle lanes, continuous centre turn lane) <$2.4 million B
>$2.4 million C
22. Redesignation of a Linear Paved Facility through signage or pavement marking modifications (i.e. not requiring physical construction beyond localized operational improvements described in activity No.12 above):
  • addition or removal of parking or turning lane markings on an existing roadway
  • conversion of one-way or two-way streets
  • redesignation of existing General Purpose
Lane (GPL) or on-street parking to High Occupancy Vehicle (HOV) or cycling lanes/facilities; vice versa
  • addition or removal of cycling lanes/facilities
  • New construction or removal of sidewalks, multi-purpose paths or cycling facilities including water crossings outside existing right-of-way
No limit A+