MNSi MNSi initially requested an easement however upon second circulation no longer requires an easement.
EnWin Utilities– Hydro No Objection, however an easement named EnWin Ultilities Ltd. May be required in the S/W alley ( if closing) to accommodate the existing overhead 120/240V hydro service.
Windsor Utilities– Water No objections
Enbridge Easement required along the Belle Isle View Blvd right-of-way.
Legal Department The conveyance price for PART 2 as shown in Appendix “A” is set at $3,937 a front metre without easements and $1,969 a front metre with easements, survey cost included.The conveyance price for PART 1, PART 3, PART 4 and, PART 5 as shown in Appendix “A” that are zoned RD1.2 is set at $1.00 plus deed preparation fee and proportionate share of the survey cost as invoiced to The Corporation of the City of Windsor by an Ontario Land Surveyor.Not withstanding the City’s current practice of dividing alleys evenly (half to each owner), the new property line should align with the location of the driveway of 921 Belle Isle View Boulevard.
OTHER: