SEWER AND COASTAL FLOOD PROTECTION MASTER PLAN
Final Recommendation Summary Report
Class EA Project Schedules
This master plan will satisfy the EA requirements for Schedule B projects.
Schedule B Projects:
The following is a general description of Schedule B projects that have been identified among the preferred solutions:
-
New and Improved Stormwater Pump Stations;
-
New Stormwater Management Ponds and Underground Storage Facilities on Private Property;
-
New Low Impact Development (LID) Measures on Private Property;
-
New Sanitary/Storm Trunk Sewers and Box Culverts Requiring Additional Property;
-
New Storm Sewers including Upgrades to Existing Outlets to the Detroit River; and
-
Barrier Landform Improvements on Riverside Drive that Require Additional Property.
Schedule B Projects:
The following is a general description of Schedule C projects that have been identified among the preferred solutions, and which will require additional Class EA studies prior to implementation:
-
New Trunk Storm Sewers that require new outlets to the Detroit River;
-
Improvements to the Little River Pollution Control Plant wastewater treatment facility, including:
-
Improvements to the existing bypass at the Pontiac pump station;
-
Interim measures to optimize the operation of the Little River Pollution Control Plant for existing wet weather flows; and
-
Future treatment plant expansion to meet the ultimate development needs.
-
The project schedules for the recommended solutions are noted in Appendix A for each solution and will be identified in the Notice of Completion. Prior to implementing any Schedule C project, additional consultation and investigation, which will fulfill Phases 3 and 4 of the Municipal Cass EA, will need to be completed and provided for public review.
During the 30 Day Review period, any person who has significant concerns about the project may request a Part II Order to request a change in the status of a the project.
If no objections are received, these projects are approved for construction.