- IX. CONCRETE BRIDGE INSTALLATION 6
- X. REMOVALS 8
- XI. PRECAST & CONCRETE FILLED JUTE BAG HEADWALLS 9
- XII. BENCH MARKS 10
- XIII. ANCILLARY WORK 10
- XIV. TOPSOIL, SEED AND MULCH 11
- XV. SPECIAL PROVISIONS FOR REPLACEMENT, REPAIR AND IMPROVMENTS 12
- XVI. GENERAL CONDITIONS 14
CITY OF WINDSOR GENERAL CONDITIONS 1 to 48
APPENDICES
APPENDIX REI-A - Standard E.R.C.A. and D.F.O. Mitigation Requirements Measures to Avoid Causing Harm to Fish and Fish Habitat SECTION II – Specifications for Fish Salvage
Standard D.F.O. Requirements for Bridges
APPENDIX REI-B -Schedule C Mitigation Plan & Seasonal Timing Windows Chart
APPENDIX REI-C -Standard Specifications for Access Bridge Construction including Precast Concrete Block Headwalls
APPENDIX REI-D -Open Air Burning – City of Windsor Fire Department
APPENDIX REI-E -Cahill Drain Plans and Details