TABLE OF CONTENTS CAHILL DRAIN

REPORT

  1. INTRODUCTION                                                                1

  2. BACKGROUND                                                                  1

  3. PRELIMINARY EXAMINATION AND ON-SITE MEETINGS         3

  4. FIELD SURVEY AND INVESTIGATIONS                                 5

  5. PIPES AND BRIDGES REVIEW                                             5

  6. THE DRAINAGE ACT                                                           8

  7. FINDINGS AND RECOMMENDATIONS                                   9

  8. ESTIMATE OF COST                                                            10

  9. DRAWINGS AND SPECIFICATIONS                                       17

  10. SCHEDULE OF ASSESSMENT                                               17

  11. FUTURE MAINTENANCE                                                      18

SCHEDULE OF ASSESSMENT                                      21

SPECIFICATIONS

  1. GENERAL SCOPE OF WORK                                                                  1

  2. E.R.C.A. AND D.F.O. CONSIDERATIONS                                                 1

  3. M.N.R.F. & M.O.E.C.P. ENDANGERED SPECIES ACT CONSIDERATIONS      2

  4. ACCESS TO WORK                                                                               3

V. REMOVAL OF BRUSH, TREES AND RUBBISH                                                4

VI. FENCING                                                                                             4

VII. DETAILS OF OPEN DRAIN WORK                                                           5

VIII. DETAILS OF BRIDGE WORK                                                                 5