GC 4.05 ACCESS TO PROPERTIES ADJOINING THE WORK AND  INTERRUPTION OF UTILITY SERVICES  

  1. The Contractor shall provide at all times and at no extra cost to the Corporation:

    1. adequate pedestrian and vehicular access including such items as temporary boardwalks, graveled or asphalted steps or ramps, temporary bus stops;
    2. continuity of utility services to properties adjoining the working area; and
    3. access to fire hydrants, and water and gas valves located in the working area.

  2. Where any interruptions in the supply of utility services are required and are authorized by the Engineer, the Contractor shall give notice to the affected property owners. 

GC 4.06 APPROVALS AND PERMITS 

  1. The Contractor shall give all notices and pay all fees, required to be given, or paid, by any and all competent and constitutional legislation or any regulation or by-law of any local or other authority in relation to the execution of the Works, or any Temporary Works; and by the rules and regulations of all public bodies and companies whose property or, rights, are, or maybe affected in any way by the Works or Temporary Works. The Contractor shall conform in all respects with the provisions of any and all competent and constitutional legislation, and the regulations or by-laws of any local or other authority, which may be applicable to the Works, or any Temporary Works and with such rules and regulations of public bodies and companies as aforesaid, and shall keep the Corporation indemnified against all penalties and liabilities of every kind for breach of any such legislation, regulation, By-law or the Common law as applicable to the Contractor's Works and duties under this contract.

  2. The Contractor shall pay and arrange for all necessary plumbing and building permits and subsequent inspections.