GC 4.07 EXCESS MATERIALS AND DISPOSAL
- The Contractor shall remove from the worksite all excess materials including earth and rock excavation, broken concrete, rubble, broken asphalt, tree stumps, etc.
- All materials such as metal, wood, asphalt, etc. which are not considered to be "inert fir as defined in section 18 of regulation 309 under the Environmental Protection Act must be disposed of at waste disposal sites certified by the Ministry of Environment to accept and dispose of these wastes or to sites certified to recycle the waste in question.
GC 4.08 TRAFFIC AND PARKING SIGNS
Prior to commencing work on any street the Contractor shall, with the Engineer and a representative of the Traffic Engineering Department, inspect all signs and ascertain which are to be removed or relocated so as not to interfere with his operations. The Contractor shall then remove or otherwise relocate these signs as directed by the Traffic Engineering Department. Twenty-four (24) hours prior to the completion of any operation to a point that additional or permanent signs are required for the general safety of pedestrians and/or the motoring public, the Contractor shall notify the Traffic Engineering Department. Also, at any time during or subsequent to construction, the Contractor shall immediately notify the Corporation's Site Representative of any signs removed or damaged due to his operations, so that these signs may be repaired, replaced and erected immediately. The cost of repair or replacement of any signs, etc. damaged or removed by the Contractor shall be at the expense of the Contractor. Any and all stop signs removed must be reinstalled by the Contractor at the end of each working day should the road be opened for evening traffic.
GC 4.09 SIDE CASTING
The Contractor shall not side cast excavated material unless specifically authorized by the Engineer prior to construction. Excavated material shall be removed from the site immediately or stockpiled at a site/location approved by the Engineer.
GC 4.10 NOTICE TO OWNERS
The Contractor may be required to contact, in writing, the owners of property abutting the area where the work is to be constructed. Notices shall be delivered one week prior to the construction starting date in that area. This notice shall include notification of any necessary removal of rocks, trees, shrubs, etc. and the expected starting and completion date.