- ii. The Contractor shall at his own expense, provide, erect, maintain adequate traffic protection signs, barricades, lights, delineators, trench plating, flag persons, etc. in accordance with the requirements of the City of Windsor, to ensure safety to the public and the smooth flow of traffic. He shall designate an employee to be responsible for the traffic, the maintenance of traffic protection devices at night, Sundays and holidays. All barricades on obstructions shall be illuminated at night and all lights shall be kept illuminated from sunset to sunrise. The Contractor shall be responsible for all accidents or expense arising by reason of neglect or failure to comply with this clause.
- iii. Traffic Control shall be in conformity with the procedure outlined in the current "Occupational Health and Safety Act, and Regulations for Construction Projects" and the current "Traffic Control Manual for Roadway Work Operations", Ministry of Transportation and Communications, and as amended. Twenty-four (24) hours prior to commencing work, the proposed traffic control will be discussed and reviewed by the Engineer's representative.
- iv. Should the Contractor fail to provide the above mentioned precautions, the Engineer may direct that the work be suspended forthwith and such suspension shall remain in effect until the Contractor has taken proper remedies. Suspension of the work on this account shall not entitle the Contractor to any extension of time of completion, nor any additional remuneration.
GC 4.04 MAINTAINING ROADWAYS AND DETOURS
- The Contractor shall not be required to maintain a road through the working area until such time as the Contractor has commenced operations or on any part of the Contract that has been accepted by the Corporation.
- Where the Contract Document provides for or the Engineer requires detours at specific locations, payment for the construction of the detours, and if required, for the subsequent removal of the detours, will be made at the Contract prices appropriate to such work.
- Where the Contractor constructs a detour which is not specifically provided for in the Contract Document or required by the Engineer, the construction of the detour and, if required, the subsequent removal shall be performed at the Contractor's expense. The detour shall be constructed and maintained to a structural and geometric standards approved by the Engineer. Removal shall be performed as directed by the Engineer.