• In subsequent discussions over the winter, staff and the owners have extensively discussed the features to be re-established on the building.

• The Owners have agreed on all features to be re-instated with the exception that they do not want to remove new roof and the sub-floor as directed by city staff;

• The replacement roof and subfloor on the parapet were installed for 2 reasons: safety so people the main would floor; not fall through between joists and to assist with the ceiling leaking into

• With the cumulative affect of all the present changes to the elevation and the re- establishment of all features noted above, the front façade of the building will look like the front façade in the designation picture (slide 2 above);

• The Owners are asking Council to approve the Heritage Alteration permit and allow for the glass railing as well as the retention of the new roof and the subfloor;