THE CORPORATION OF THE CITY OF WINDSOR PROCEDURE
Service Area: | Office of the City Solicitor | Procedure No.: | |
---|---|---|---|
Department: | Planning and Building Services | Approval Date: | |
Division: | Transportation Planning | Approved By: | |
Effective Date: | On approval | ||
Subject: | Vision Zero Procedure | Policy Ref.: | |
Pages: | Replaces: N/A | ||
Prepared By: | J. Hagan | 4 | Date: N/A |
1. PURPOSE
1.1.This procedure is intended to provide details for implementation of the Vision Zero Policy.
2. SCOPE
2.1.This policy provides the details of how Vision Zero is to be implemented for the Corporation.
3. RESPONSIBILITY
3.1.Responsibility for implementing this procedure is outlined in the Vision Zero Policy.
4. PROCEDURE
- 4.1. The Vision Zero Action Plan shall:
- 4.1.1. Identify a target date to achieve the goal of zero fatal and serious injury collisions on City of Windsor roads.
- 4.1.2. Identify strategic priorities in order to achieve this goal.
- 4.1.3. Identify initiatives to achieve each strategic priority, including the person or position that has primary responsibility for carrying out the initiative.
- 4.1.4. Develop an implementation plan, including interim goals for each initiative. Interim goals should be specific, measurable, and have an identified date.
- 4.1.5. Incorporate the Vision Zero foundational elements identified by the Vision Zero Network:
- 4.1.5.1. A robust data framework,
- 4.1.5.2. Measurable goals with a clear timeline for implementation,
- 4.1.5.3. Accountability, and
- 4.1.5.4. Transparency.
- 4.2.Consultation with the Vision Zero Stakeholder Group should occur at the following points, at minimum: