Figure 8: Alternate Route around Wyandotte/Drouillard Intersection (Report S 44/2018)
Other Active Transportation Projects
The Active Transportation Master Plan identifies a number of other future cycling routes in this area. The cycling network prioritization map from the ATMP is attached as Appendix 3. Routes crossing or near the Wyandotte Street East corridor are summarized in Table 1.
Route | ATMP Priority | Status | Good Candidate for Acceleration? | Notes |
---|---|---|---|---|
Riverside Drive Bicycle Lanes | Low | Varies by section | No | Bicycle lanes are being built out as per the Riverside Drive Vista EA. Construction generally requires utility relocation and road reconstruction; accelerating the project quicker than the current schedule is likely not feasible. |
Ontario / St. Rose / Jerome Local Street Bikeway | Medium / Low (varies by segment) | Initial Planning | Yes | Priority is based on the Wyandotte Street East multi-modal corridor. |