Canada Post | No comments received. |
Rogers Communications | No comments received. |
Telus Communications | TELUS has no infrastructure in the area of your proposed work. Permit expires six(6) months from approval date. |
MNSi | No comments received. |
EnWin Utilities – Hydro | No objection to alley closing, however, an easement named to Enwin Utilities Ltd., is required for the entire N/S alley upon closing to accommodate existing 120/240 volt overhead hydro distribution. |
Windsor Utilities – Water | Water Engineering has no objections. |
Enbridge | Please note that Enbridge Gas has active infrastructure in the proposed area. Enbridge Gas requires a minimum separation of 0.3m from all of our plant. Please ensure that this minimum separation requirement is maintained, and that the contractor obtains locates prior to performing any work and utilizes safe excavation practices while performing any work in the vicinity. Easement required. |
Legal Department | For alleys abutting lands zoned RD1.3: $1.00, plus deed preparation, plus proportionate survey costs. For alleys abutting lands zoned MD1.1: $117.22 per square metre. |