Council Report: S 9/2020

Subject: Close and Convey the North/South Alley Between Blackburn Court and Huron Church Road - Applicant: E. Selaya - 3769 Blackburn Court - SAA/5612 – Ward 2

Reference:

Date to Council: November 16, 2020
Author: Christopher Aspila MCIP, RPP
Senior Planner - Policy & Special Studies
Email: caspila@citywindsor.ca
Phone: 519-255-6543 x6446
Planning & Building Services
Report Date: February 20, 2020
Clerk’s File #: SAA2020

To : Mayor and Members of City Council

Recommendation:

  1. THAT the portion of the 3.66 metre wide north/south alley located west of Huron Church Road abutting properties on the east side of Blackburn Court, and shown on Drawing No. CC-1738 labelled as Part 1 and Part 2 attached as Appendix “A”, BE ASSUMED for subsequent closure.

  2. THAT the portion of the 3.66 metre wide north/south alley located west of Huron Church Road abutting properties on the east side of Blackburn Court, and shown on Drawing No. CC-1738 labelled as Part 1 and Part 2 attached as Appendix “A” , BE CLOSED AND CONVEYED in two equal halves to the abutting property owners, in a manner deemed appropriate by the City Planner, subject to the following:

    a) Easement, subject to their being accepted in the City’s standard form and in accordance with th e City’s standard practice, be granted to:

    • Bell Canada, Cogeco Connexion, MNSi and Enwin Utilities Ltd.

  3. THAT Conveyance Cost BE SET as follows:

a) For portions of the alley abutting lands zoned Residential RD1.2: $1.00 plus deed preparation fee and proportionate share of the survey costs as invoiced to The Corporation of the City of Windsor by an Ontario Land Surveyor;