Appendix E
Consultations

ENWIN UTILITIES

Hydro Engineering:

No Objection on the following condition:

The existing overhead service wires (see pics - sent to the applicant ), must have the minimum required clearance from any window (see attached Enwin Servicing Guidelines):

Please ensure that the minimum clearance requirement is maintained or that the window is fixed (unable to open).

Water Engineering: Water Engineering has no objections to the rezoning.

tsd@enwin.com

P. (519) 251-7303

F. (519) 251-7309

4545 Rhodes Drive | P.O. Box 1625 Station A | Windsor, Ontario | N8W 5T1

PLANNING DEPARTMENT – URBAN DESIGN DIVISION

Please make the applicant aware that Council has approved the development of a University Avenue West and Wyandotte Street West Community Improvement Plan. The approved Terms of Reference can be found in the November 18, 2019 Council Agenda, Item 8.21.

To build on the comments from the Heritage Planner, the applicant is encouraged to design the facade in a way that respects the traditional commercial storefront design to allow future flexibility of uses and maintains an attractive street presence.

Laura Diotte, MCIP, RPP | Planner III - Special Projects