of the plan such as the proposed pumping station at St. Rose and Riverside Drive East, and suggests that it be deferred to review other possible options and to ensure proper environmental, noise and pollution studies are undertaken.

Dr. Nizar Naji, Resident of Windsor

Dr. Nizar Naji, resident of Windsor, appears before Council to provide comment regarding the notice of completion for the Sewer and Coastal Flood Protection Master Plan Environmental Assessment, stating support for the plan, save and except the proposed pumping station at St. Rose and Riverside Drive East, suggesting that greenspace is a precious and valuable resource and that once this greenspace is built upon, it is gone and cannot be reclaimed.

Charmaine Kunz, Resident of Windsor

Charmaine Kunz, resident of Windsor, appears before Council to provide comment regarding the notice of completion for the Sewer and Coastal Flood Protection Master Plan Environmental Assessment, stating support for the plan, save and except the proposed pumping station at St. Rose and Riverside Drive East, which should at minimum be deferred to allow for further review of other possible options.

Moved by: Councillor McKenzie

Seconded by: Councillor Gignac

Decision Number: CR579/2020

  1. That the report Sewer and Coastal Flood Protection Master Plan Environmental Assessment – Filing the Notice of Study Completion BE RECEIVED for information; and,

  2. That Administration BE DIRECTED to issue the Notice of Study Completion for the Sewer and Coastal Flood Protection Master Plan Environmental Assessment.

Carried.

Report Number: C 212/2020

Clerk's File: SW/12983

11.5. Response to CQ 25-2020 – August 28, 2020 Flood Event ----Ward 1 and 9

Jayme Lauzon, Area Resident

Jayme Lauzon, area resident, appears before Council to provide comment regarding the administrative report in response to the August 28, 2020 flood event, from the perspective of being a resident in the Devonshire Heights area, stating that flooding and poor drainage have been a persistent issue there for a long time, and that when there are heavy rain days or days of steady rain, their pumps run non- stop and that some pumps don’t sh ut off for lengths of time and concludes by asking that this area be flagged on the improvement plan.