The proposed revised 2021 locations are outlined in the following table.
Items 2, 4, and 5 are proposed additions to 2021 program.
PROPOSED REVISED 2021 ROAD REHABILITATION PROGRAM | ||||
---|---|---|---|---|
ITEM NO. | STREET | FROM | TO | REHAB. TYPE |
1 | CAMERON AVE | RIVERSIDE DR | CUL-DE-SAC | M |
2 | KILDARE RD | ASSUMPTION ST | WYANDOTTE ST E | R |
3 | LABELLE STREET | ROCKWELL AVENUE | ALEXANDRA AVENUE | R |
4 | GLADSTONE | TECUMSEH | YPRES | R |
5 | MATCHETTE RD | EC ROW | CHAPPELL AVE | FDR |
6 | TECUMSEH ROAD EAST | WALKER RD | DROUILLARD RD | R/M |
TOTAL BUDGET | $5,048,000.00 |
There will be no impact on the total 2021 budget required as a result of the proposed 2021 road rehabilitation revisions as outlined in this report.
Consultations:
Spencer Johnston Manager Water Construction & Design ENWIN Utilities Ltd,
Chris Manzon Director Engineering (Water) ENWIN Utilities Ltd.
Conclusion:
It is recommended that City Council approve the revised 2021 road rehabilitation program to work in conjunction with the ENWIN-Water Division.
Planning Act Matters:
N/A
Approvals:
Name | Title |
---|---|
Cindy Becker | Financial Planning Administrator – Public Works Operations |