4.0 ADDITIONAL CONSIDERATIONS
Existing Tree Inventory & Protection Plan
An Existing Tree Inventory & Protection Plan (the “ETI&PP”) has been prepared by Bezaire Partners and submitted in support of the OPA and ZBA applications. The ETI&PP does not recommend any of the existing trees on the subject lands be protected. Detailed landscape plans will be required through the future Site Plan approval process with respect to future plantings.
Stormwater Management Report
A Stormwater Management Report (the “Report”) has been prepared by Aleo Associates Inc. and submitted in support of the OPA and ZBA applications. The Report details stormwater quality and quantity control at a functional level through the development of a four-storey residential apartment building and surface parking. Detailed engineering drawings will be submitted in support of a future Site Plan application.
Road Traffic and Stationary Noise Impact Study – Acoustic Engineering Ltd.
A Road Traffic and Stationary Noise Impact Study (the “Noise Study”) has been completed and submitted in support of the proposed OPA and ZBA applications in accordance with the Ontario Ministry of the Environment and Climate Change (MOECC) NPC 300. The Noise Study has determined the proposed development will have a requirement for central air-conditioning, noise warning clauses and special building components. Road traffic noise control requirements for the subject lands were determined based on road traffic volumes for 2013 provided by the City of Windsor (City) and forecasted to 2030. The Noise Study conclusions can be included as Site Plan conditions of approval.