MINUTES
Development & Heritage Committee Meeting 10,
August , 2020

RECOMMENDATIONS

  1. THAT an amendment to the Zoning By-law 8600 BE APPROVED to change the zoning of the lands located on the south side of Milloy Street, between Meldrum Road and Chandler Road as follows:

    1. Lots 99 to 109; Lots 142 to 152 & Pt closed Alley, RP 1098, designated as PARTS 1 to 3 12R25458, and Lots 16 to 18, 220 to 222, Pt lot 219 and Pt closed Alley, RP 1098, from Residential District 1.1 (RD1.1) to Residential District 1.2 (RD1.2) with holding prefix, for the purpose of developing 28 single unit dwelling lots; and

    2. Lots 19, 20, 223 & 224 and Part closed Alley on RP 1098, from Residential District 1.1 (RD1.1) to Green District 1.5 (GD1.5), to accommodate required storm water management facility.

  2. THAT the holding (H) symbol BE REMOVED when the applicant/owner submits an application to remove the holding symbol and the following conditions are satisfied:

    1. General Provisions – The applicant shall conform to the General Provisions of Council Resolutions 233/98 and any other specific requirements. Applicant shall submit proof of the said conformity, to the satisfaction of the City Engineer.

    2. Servicing Study – Prior to the issuance of a Street opening permit, the applicant shall review the existing and proposed sewer system for this development to determine its effect on the municipal sewer system. The study shall be done to the satisfaction of the City Engineer and the Chief Building Official. The applicant is required to demonstrate that no negative impacts will be realized by the existing surrounding community, before the proposed development will be allowed to proceed.

    3. Stormwater Management Analysis – The applicant shall complete storm water management analysis to the satisfaction of the City Engineer. Stormwater quality and stormwater quantity shall be addressed up to and including 1:100 year storm event and be in accordance with the guidance provided by the Stormwater Management Planning and Guidance Manual, prepared by the Ministry of the Environment (MOE, 2003) and the “Windsor-Essex Region Stormwater Management Standards Manual”.

    4. Street Opening Permit – The applicant shall obtain street opening permits for sewer taps, drain taps, road construction, sidewalks, street lights, etc. from the City Engineer, prior to commencement of any construction on the public highway.

    5. Sidewalks – The applicant shall construct, at its entire expense, according to City of Windsor Standard Specifications and in a manner satisfactory to the City Engineer, a concrete sidewalk along the east side of Meighen Road from Milloy Street to the southerly limit of the Meighen Road extension.

    6. Meighen Road Cul-De-Sac – The applicant shall construct a cul-de-sac with a minimum radius of 9.5m at the southerly limit of the Meighen Road extension.