Local Improvement Works – The owner(s) shall agree to sign petitions for and not to oppose the construction, under the provisions of Ontario Regulation 586/06 for local improvements, of a sanitary sewer abutting the subject lands.
Sewer Connections – The owner(s) will be required to obtain a permit from the Engineering Department to connect the private sanitary connection to the future service provided at the property line by the Local Improvement.
Land Conveyance – The owner further agrees, prior to the issuance of a construction permit, to gratuitously convey to the Corporation, in fee simple and without encumbrance, a 3.0m wide parcel across the entire 7th Concession Road frontage and a 2.0m wide parcel across the entire Baseline Road frontage of the subject lands for road widening purposes, in accordance with the requirements of the County Road 42 Portion of the Lauzon Parkway Environmental Assessment Report, and to the satisfaction of the City Engineer
Corner Cut-Off – The Owner agrees, prior to the issuance of a construction permit, to gratuitously convey a corner cut-off sufficient in magnitude to facilitate improvements at the 7th Concession Road/County Road 42 Intersection, in accordance with the requirements of the County Road 42 Portion of the Lauzon Parkway Environmental Assessment Report, and to the satisfaction of the City Engineer
Sidewalks –The owner(s) agrees, to:
-
Construct at their expense and according to City of Windsor Standard Specifications, a concrete sidewalk along the entire 7th Concession Rd and Baseline Road frontages of the subject lands. All work to be to the satisfaction of the City Engineer;
or -
Pay to the Corporation, prior to the issuance of a Building Permit, the sum of $25,000.00 being the Owner’s contribution towards the future construction of a concrete sidewalk along the entire 7th Concession Rd and Baseline Road frontages of the subject lands.
It will be up to the discretion of the City Engineer whether or not a cash contribution will be allowed in lieu of sidewalk construction by the
Curbs and Gutters – The Owner further agrees, at the discretion of the City Engineer, to:
- Construct at their own expense and according to City of Windsor Standard Specifications, a concrete curb and gutter along the entire 7th Concession Rd and Baseline Road frontages of the subject lands. All work to be to the satisfaction of the Corporation’s City Engineer;
or - Pay to the Corporation, prior to the issuance of a construction permit, the sum of $14,000.00 being the Owner’s contribution towards the future construction of concrete curb and gutter on the frontage of the subject lands.
It will be up to the discretion of the City Engineer whether a cash contribution will be allowed in lieu of curb and gutter construction by the Owner.
Storm Detention - Prior to the issuance of a Building Permit, the applicant(s) shall agree to retain a consulting engineer for the design and preparation of drawings, satisfactory to the City Engineer, for an internal stormwater detention scheme to service the subject lands. The purpose of this scheme will be to ensure that the storm drainage being directed to the Corporation’s storm sewer or ditch, from the lands in their improved state, be restricted to no greater than the present
Page 2 of 9