ENWIN UTILITIES (Hydro Engineering) – Cecile Dalgleish, March 10, 2020

No Objection, however, please note that ENWIN has an existing overhead 27.6kV high voltage pole line running North/South in the alley at the rear of the property and an existing 120/240 conductor servicing 1035 California. Adequate clearance must be maintained during and after construction. We recommend referring to the Occupational Health and Safety and Building Code to ensure that safe limits of approach and minimum clearances are achieved.

ENWIN UTILITIES (Water Engineering) – Cecile Dalgleish, March 10, 2020

Water Engineering has no objections to the rezoning.

WINDSOR FIRE & RESCUE SERVICES – John Lee, March 12, 2020

No concerns from WFRS for change of zoning.

WINDSOR POLICE SERVICE – Barry Horrobin

Comment Pending