ii) Block 37 on Map No. SDN-003/19-1 to the Corporation of the City of Windsor for future road allowance (Florence Avenue extension), to the satisfaction of the City Engineer and City Solicitor;
-
6. Sidewalks: The Owner(s) shall construct, at its expense, according to City of Windsor Standard Specifications and in a manner satisfactory to the City Engineer, concrete sidewalks on both sides of Florence Avenue, and on one side of Streets A and B.
-
7. The Owner(s) shall construct all sidewalks in conformity with the requirements of the Accessibility for Ontarians with Disabilities Act (AODA) and to construct all accesses in conformity to the TAC Geometric Design for Canadian Roads and the City of Windsor Standard Engineering Drawings, to the satisfaction of the City Engineer.
-
8. Oversizing: The Owner(s) shall pay to the Corporation of the City of Windsor, prior to the issuance of a construction permit, its share of the costs as determined by the City Engineer for previously oversized services that were constructed to ensure that the subject lands could be serviced.
-
9. Servicing of abutting lots: The Owner(s) shall, at its entire expense, install required municipal services to the lots along the east limit of the abutting north/south alley, being Lots 34 to 44 (incl.) on Registered Plan 1142. All work is to be completed to the satisfaction of the City Engineer.
-
10. East side Florence Avenue abutting properties cost sharing: Upon completion of the infrastructure services noted in paragraph 9 above, the Owner(s) shall, prior to final approval of the Plan of Subdivision, create a 0.3m wide reserve on the M-Plan along the entire east limit of the north/south alley located at the west limit of lots 34 to 44 on RP 1142, to the satisfaction of the City Engineer and City Planner.
Individual property owners of Lots 34 to 44 RP 1142 will have the option of connecting into the infrastructure services within the Florence Avenue extension upon payment to the Owner, the individual property owner’s proportionate share of costs of this infrastructure. After payment of the proportionate share of said infrastructure costs, the corresponding portion of the 0.3m reserve abutting such individual owner’s property will BE DECLARED a public highway.
In the event that some or all of the individual property owners of Lots 34 to 44 RP 1142 have not paid their proportionate share of the infrastructure costs, then the Corporation agrees to pay to the Owner, the Owner’s servicing costs attributable to Lots 34 to 44 RP 1142 less any payments collected by the Owner from the individual property owners. The Corporation agrees to pay these costs to the Owner, subject to budget approval, no earlier than three (3) years following substantial performance of this subdivision agreement, as indicated by the commencement of the maintenance period.