Central Windsor – Basement and Surface Flooding Risk Reduction
Bruce Avenue and Marentette Avenue Drainage Area Improvements
Recommended Improvements Bruce Ave. (STM-C4)
Recommended Improvements Bruce Ave. (STM-C4)
• Construction of 2000 m of new storm sewers along Bruce Ave. to a proposed outlet to Detroit River.
• Schedule C Project.
Giles Blvd., Erie St. and McDougall St. (STM-C15)
• Construction of 1500 m of new storm sewers along Giles Blvd., Erie St. and McDougall St. This sewer is designed to “interconnect” the existing storm sewers to better equalize flows in the system.
• Schedule A+ Project.
• Construction of 800 m of new storm sewers along Parent Ave. to a proposed outfall at the Detroit River.
• Schedule C Project.
Parent Ave. (STM-16)
Parent Ave. (STM-16)
• To manage surface flooding under the Climate Change Storm (1:100 year +40% Factor):
Legend:
Applicable Drainage Area
Storm Trunk Sewer Improvements
Proposed New or Improved Storm Outlet to Detroit River
• Construction of 450 m of new storm sewers along Parent Ave. north of Giles.
• Schedule A+ Project.