Point #5 Downspout Disconnection: A recommendation of this report is that council authorize Administration to proceed with developing a mandatory downspout disconnection pilot program.
Point #6 Riverside Vista Project, Phase 2A: Riverside Vista Project, Phase 2A, from Ford Boulevard to St. Rose Avenue is currently in the design phase. The City has been awarded grant funding through the first Disaster Mitigation and Adaptation Fund (DMAF) for the trunk storm sewer work. The City is also awaiting a decision on DMAF 3 – Targeting Success for additional grant funding.
Point #7 Sewer Master Plan: This report provides the Final Council Recommendations Summary of the Sewer and Coastal Flood Protection Master Plan.
While fully implementing the recommendations contained in the Master Plan is expensive, the study provides a practical outline of recommendations using cost/benefit analysis that is achievable over time. As the recommended short-term and long-term solutions are implemented, incremental benefits to the system will be achieved and the risk of costly basement, surface and coastal flooding will be reduced.
Planning Act Matters:
Approvals:
Name | Title |
---|---|
Fahd Mikhael | Manager of Design and Development |
France Isabelle-Tunks | Senior Manager of Engineering / Deputy City Engineer |
Mark Winterton | City Engineer and Corporate Leader Environmental Protection and Infrastructure Services |
Joe Mancina | City Treasurer/Chief Financial Officer |
Onorio Colucci | Chief Administrative Officer |
Notifications:
Name | Address | |
---|---|---|
Flavio Forest | fforest@dillon.ca |
Appendices:
-
WSMP Final Council Report July 20, 2020
-
WSMP Final Council Report July 20, 2020 – Appendix A
-
WSMP Final Council Report July 20, 2020 – Appendix B –1
-
WSMP Final Council Report July 20, 2020 – Appendix B –2