Project Name Project Extents/Address Design/ReportPeriod ConstructionPeriod (including 1yr maintenance) Status
Greenhouse Gas Mitigation Assessment & Climate Change Study n/a 2019 xx Complete
St Paul Pump Station Environmental Assessment (EA) 7730 Riverside Dr. 2020 xx Being completed as a Schedule B as part of the Sewer Master Plan which is in the final stages
LRPCP Overflow at Pontiac Pump Station Environmental Assessment (EA) 9400-9578 Little River 2021 - 2022 xx EA to commence in 2021
East Marsh Pump Station Environmental Assessment (EA) 10864 Riverside Dr. 2020 xx Being completed as a Schedule B as part of the Sewer Master Plan which is in the final stages
Matthew Brady Blvd, Phase 2 Edgar To Tranby 2018 - 2019 2019-2020 Maintenance Stage
Belle Isle View, Phase 1 Wyandotte to St Rose 2019 2019-2021 Maintenance Stage
Belle Isle View, Phase 2 St Rose to Edgar 2020 2020-2021 Design Stage
Eastlawn Blvd Wyandotte to Edgar 2020 - 2021 2021-2022 Design Stage
Matthew Brady Blvd, Phase 3 Wyandotte to St Rose 2021 - 2022 2022-2023 Design to commence in 2021
East Marsh Road Drainage Re-direction,Various Phases Menard St, John M St,Florence Ave, Clover St,Elinor St,& Clairview Ave 2019 - 2023 2022 – 2025 (multi-phased) Local Improvement Stage
Tranby Park Stormwater Management Tranby Park 2019 2020 - 2021 Maintenance Stage
Tranby Avenue Reconstruction Parkview to Isabelle 2019 - 2020 2020 - 2021 Design Stage
Riverside/Vista Relief Storage, Phase 2A Ford Blvd to St. Rose 2017 - 2022 2022 – 2025(includes advance utility relocation) Design Stage
Cedarview Relief Sewer Laporte to Isack 2024 - 2025 2025 - 2026 Design to commence in 2024