Marine Pollution Control Corp. EMERGENCY RESPONSE RATE SCHEDULE Effective Date, March 1st, 2019
Field Support Equipment (Continued) Rate
AIR BOTTLE REFILLS (CYINDER)
-
LOW PRESSURE ONLY (EA)
-
&
(LOW & HIGH
(LOW & HIGH
&
PNEUMATIC DRILL (DAY)
PNEUMATIC RECIPROCATING SAW (DAY)
PORTABLE ARC WELDER (DAY)
PRESSURE WASHER (DAY)
PRESSURE WASHER EXTENSION LANCE (DAY)
SAWZALL (DAY)
SEWER PLUG (16"-30") (DAY)
SEWER PLUG (0212") (DAY)
SURVEY EQUIPMENT (DAY)
TEEL PUMP (DAY)
TRUCK RAMP (DAY)
Safety & HazMat Equipment
ACID I CHEMICAL BOOTS (PAIR)
ACID I CHEMICAL SUIT (ch3) (EA)
ACID I CHEMICAL SUIT (CPF4) (EA)
ACID I CHEMICAL SUIT (TYCHEM BR) (EA)
ACID I CHEMICAL SUIT (TYCHEM F) (EA)
ACID I CHEMICAL SUIT (GREEN , GENERAL USE, FR RATED) (EA)
FALL ARREST SYSTEM KIT (INCLUDES TRIPOD, TAGLINES, HARNESSES,
DAY)
LANYARDS) (DAY)
WINTER WORK (PER PAIR)
-
-
LOW PRESSURE ONLY (EA)
AIR BOTTLE REFILLS (SCBA BOTTLES) (EA)
INCLUDES GAGE SPLITTER) AIR PACKISCBA (LOW & HIGH PRESSURE) (DAY)
AIR TRAILER (INCL. 5—10 CYLINDERS. 300 FEET 0F LINE.
SPLITTERS) (DAY)
BACON BOMB SAMPLER (DAY)
BOOTIES (PAIR)
BREATHING AIR CASCADE PRESSURE GAUGE (DAY)
BREATHING AIR LINE (50' SECTIONS) (DAY)
CASCADE SPLITTER. 4 PERSON (DAY)
CGIICOMBO METER (02 I LEL I co I H2S) (DAY)
COOLING VESTS (DAY)
GAUGES. CASECADE
DAVIT ARM (DAY)
DIGITAL THERMOMETER (DAY)