Council Report: S 123/2020
Subject: Close and Convey the North/South Alley Between Northwood Street and EC Row Expressway, East of Partington Avenue and West of Roxborough Boulevard - SAA/6066 - Applicant: South Windsor Development Co. - Ward 10
Reference:
Date to Council: September 21, 2020Author: Christopher Aspila MCIP, RPP
Senior Planner - Policy & Special Studies
Phone: 519-255-6543 x6446
Email: caspila@citywindsor.ca
Planning & Building Services
Report Date: September 1, 2020
Clerk’s File #: SAA2020
To: Mayor and Members of City Council
Recommendation:
-
That the portion of the 4.27 metre wide north/south alley located between Northwood Street and EC Row Expressway, east of Partington Avenue and West of Roxborough Boulevard, and shown on Drawing No. CC-1773 attached as Appendix “A”, BE ASSUMED for subsequent closure.
-
That the portion of the 4.27 metre wide north/south alley located between Northwood Street and EC Row Expressway, east of Partington Avenue and West of Roxborough Boulevard, and shown on Drawing No. CC-1773 attached as Appendix “A”, BE CLOSED AND CONVEYED in two equal halves, along the centre of the subject alley, to the abutting property owners, subject to the following:
a) Easement, subject to their being accepted in the City’s standard form and in accordance with the City’s standard practice, be granted to:
-
Enwin Utilities Ltd.
-
-
THAT Conveyance Cost BE SET as follows:
a. For alley abutting lands zoned Holding Residential HRD1.1 or Holding Residential HRD1.2: $1.00 plus deed preparation fee and proportionate share of the survey costs as invoiced to The Corporation of the City of Windsor by an Ontario Land Surveyor.