Construct at their own expense and according to City of Windsor Standard Specifications, a concrete curb and gutter along the entire 7th Concession Rd and Baseline Road frontages of the subject lands. All work to be to the satisfaction of the Corporation's City Engineer; or

  1. Pay to the Corporation, prior to the issuance of a construction permit, the sum of $14,000.00 being the Owner's contribution towards the future construction of concrete curb and gutter on the frontage of the subject lands.

Storm Detention - construct storm detention scheme, to the satisfaction of the City Engineer and the Ministry of Environment, Conservation & Parks (MECP).

ERCA Requirements – follow all drainage and flood-proofing recommendations of the Essex Region Conservation Authority (ERCA) may have with respect to the subject land, and obtain all necessary permits from ERCA with respect to the drainage works on the subject lands.

Off-Site Improvement – an auxiliary westbound left-turn lane with a storage length of 15-meters at the intersection of Concession Road 7 and West Driveway to be provided at the owner’s cost.

Enbridge Gas requirement - a minimum separation of 0.3m from all Gas facilities.

Noise mitigation measures – implementation of the mitigation measures recommended in the Noise Report dated January 22, 2020, prepared by Akoustik Engineering Limited.

Carried.

Report Number: SCM 187/2020 & S 42/2020

Clerk’s File: ZB/13675

12. CONSIDERATION OF COMMITTEE REPORTS

12.1. (i) Report of the Special In-Camera meeting or other Committee as may be held prior to Council

Moved by: Councillor Gignac

Seconded by: Councillor Bortolin

Decision Number: CR361/2020

That the report of the In Camera meeting held July 13, 2020 BE ADOPTED as presented.
Carried.