4.4

Implement the recommendations of the East Riverside Flood Risk study to reduce overland flooding risk - Assess vulnerable areas and properties along the Detroit River; Share the findings with the public and conduct public education on flooding risks, responsibilities and emergency response; Enhance the barrier landform where required; Ensure protection of the St. Paul Pump Station.

Lead: Engineering. Supporting Role: Operations; Pollution Control; ERCA.

Medium-Term

$$$$

High

4.5

Continue to monitor Little River overland flooding risk - Inspect the landform along the Little River channel and provide enhancements as required; Enhance the berm around the Little River Pollution Control Plant to protect critical infrastructure.

Lead: Operations. Supporting Role: Engineering; ERCA.

Short-Term

$$$

High

4.6

Complete infrastructure projects that received funding as part of the Disaster Mitigation & Adaptation Fund grant - Implement the Pontiac/St. Paul pump station study; Implement stormwater management improvements to Tranby Park; Complete the Upper/Lower Little River Flood Plain Mapping Study.

Lead: Engineering; Pollution Control; Parks. Supporting Role: Asset Planning; ESCC; ERCA.

Medium-Term

$$$$

High

4.7

Continue to invest in stormwater and sewer infrastructure - Conduct vulnerability and risk assessments for critical infrastructure including pump stations (ex: Clairview, East Marsh, Riverdale, Ford, Buckingham and Woods); Invest in municipal drain (ex: 6th concession drain along Baseline) and stormwater pond improvements; Where warranted, enhance stormwater infrastructure operations and maintenance; Increase drawdown rates for stormwater ponds; Enhance phragmites control to maintain capacity of drains and ponds.

Lead: Pollution Control; Engineering. Supporting Role: Operations.

Medium-Term

$$$

Medium