The owners took their request for Heritage Permit to the Planning and Heritage Committee in December 2019 where the committee recommended Council Oe legate approval of the permit to staff:
-
The Owner: have been successful in re-MobSling most of the significant feature: (note the picture Of the residence today below siOe 3) The Cromer:, in cons; Ration with their structural engineer, have committed to providing the additional, item: noted to complete the reestablishment of the heritage attribute: and *ring the front facade back into compliance with the degradation bravo:
- Glass ruing *third parapet wall to meet Ontario Building Code retirements;
- The top elevation of the column than be r lower than the highest point of the arch shape in me paper between column:
- 4" wide x thick stucco trim at the top edge of the parapet with color to match windows (color chosen by city staff):
- parapet wall profit to match ore-renowned profile a: much as possible and in show:
- taper and blend edge of autos at least 12" to eliminate defined line.