any time between the hours of 8:30 a.m. and 4:30 p.m. local time, visit the said office of the Engineer on any working day and examine the said soil report. The Tenderer shall note that the said soil report will have been prepared for the purpose of designing the Works, and he shall in no way hold the Corporation liable for any of the contents of the said report. The report shall be intended to be a guide for the Contractor in ascertaining the best possible construction methods to be used by him in carrying out the Contract. 

GC 2.04 DOCUMENTS MUTUALLY EXPLANATORY 

The several documents forming the Contract are to be taken as mutually explanatory of the one another, and in case of ambiguities or discrepancies, the same shall be explained and adjusted by the Engineer, who shall thereupon issue to the Contractor instructions directing in what manner the work is to be carried out. 

GC 2.05 CUSTODY OF DRAWINGS 

  1. The Drawings shall remain in the sole custody of the Engineer but up to six (6) copies thereof shall be furnished to the Contractor free of cost. The Contractor shall provide and make at his own expense any further copies required by him. At the completion of the contract, the Contractor shall return to the Engineer all drawings provided under the Contract.

  2. The Contractor shall give adequate notice in writing to the Engineer of any further drawing or specification that may be required for the execution of the Works, or otherwise, under the Contract.

  3. One copy of the Drawings furnished to the Contractor as aforesaid, shall be kept by the Contractor on Site, and the same shall at all reasonable times, be available for inspection and use by the Engineer, the Engineer's Representative, and by any other person authorized by the Engineer in writing.

  4. The Engineer shall have full power and authority to supply to the Contractor, from time to time, during the progress of the Works, such further drawings and instructions as shall be necessary for the purpose of