by an insurance company satisfactory to the Corporation to insure the Contract against any claims arising out of the construction or installation of the Works or any operations of the Contractor in connection therewith until the termination of the Contractor's obligation respecting guarantee and maintenance. 

GC 7 MEASUREMENT AND PAYMENT 

 

GC 7.01 QUANTITIES 

  1. The quantities set out in the Schedule of Unit Prices are the estimated quantities of the Works, and they are not to be taken as the actual and correct quantities of the Works to be executed by the Contractor in fulfillment of his obligations under the Contract.

  2. The Engineer shall, except as otherwise stated or agreed, determine by measurement the value of the Work done all in accordance with the Contract. He shall, when he requires any part or parts of the Works to be measured, give notice to the Contractor who shall forthwith attend, or send a qualified agent, to assist the Engineer in making such measurements; and shall furnish all particulars. Should the Contractor not attend, or neglect or omit to send such agent, then the measurement made by the Engineer, or approved by him, shall be taken to be the correct measurement of the work. 

GC 7.02 WEIGHING GRANULAR MATERIALS 

The scale location shall be as approved by the Engineer and the material shall be hauled directly from the scale to the point of application. The scale may be located at the source. Except that where there is a waste or loss of material, the hauling operation shall terminate until the Contractor shall provide, at his expense, scales licensed in accordance with the Weights and Measurements Act.