Page: 74
- c) Bridge No. 5: 12.0 metres at $70.00 per lineal metre $ 840.00
- d) Bridge No. 7: 6.3 metres at $70.00 per lineal metre $ 441.00
- e) Bridge No. 10: 13.0 metres at $70.00 per lineal metre $ 910.00
- f) Bridge No. 11: 6.1 metres at $70.00 per lineal metre $ 427.00
- g) Bridge No. 13: 5.2 metres at $70.00 per lineal metre $ 364.00
- h) Bridge No. 14: 4.4 metres at $70.00 per lineal metre $ 308.00
- i) Bridge No. 15: 6.2 metres at $70.00 per lineal metre $ 868.00
- j) Bridge No. 17: 9.8 metres at $70.00 per lineal metre $ 1,372.00
- k) Bridge No. 18: 9.4 metres at $70.00 per lineal metre $ 1,31600
- l) Bridge No. 20: 6.2 metres at $120.00 per lineal metre $ 1,488.00
- m) Bridge No. 23: 6.1 metres at $70.00 per lineal metre $ 854.00
- n) Bridge No. 24: 6.2 metres at $70.00 per lineal metre $ 868.00
- o) Bridge No. 25: 4.4 metres at $120.00 per lineal metre $ 1,056.00
- Item 5) Bridge No. 2; Provide all labour, equipment and material to construct a new gravel shoulder on the west end as seen on the attached plans; provide standard precast concrete block end protection with geogrid reinforcement for the west headwall with 1.0 metre wide sloped quarried limestone erosion protection on the banks adjacent to the precast headwall; supply and install O.P.S.D. 980.101 pedestrian barricade handrails on the west side of the bridge with concrete footings and O.P.S.D. 972.130 chain link fence including concrete footings; the Contractor shall cut or disconnect the existing guide rail at its nearest connection for access to the gravel shoulder and provide new rail ends; granular bedding, backfill, and Granular 'A' approach; excavation, compaction, silt and sediment controls, traffic control, cleanup and restoration, complete. (080-130-08300-0000 & 080-140-00100-0000)
Lump Sum $ 11,800.00
- Bridge No. 3; Provide all labour, equipment and material to remove the existing concrete span pedestrian bridge and abutments; remove and dispose of brush, sod, and deleterious materials at the existing bridge location; restore the drain cross section to its designed parameters and provide seeding and mulch to disturbed areas; excavation,