TABLE OF CONTENTS
Distribution List Preamble Glossary of Terms
- INTRODUCTION 1
- Project Overview 1
- Fisheries Plan Scope and Purpose 2
- Fisheries Plan Goals and Objectives 3
- Existing Conditions 3
- Healy Drain Existing Conditions 3
- Aquatic Species at Risk 4
- Detroit River 4
- Healy Drain 4
- Healy Drain Infilling 4
- Scope and Purpose 4
- Proposed Works Overview 5
- Construction Methodology 5
- Construction Impacts and Mitigation Measures 6
- Potential Impacts to Fish and Fish Habitat 6
- Residual Impacts and Compensation 6
- Mitigation Requirements 7
- Requirements for Construction in Waterbodies and Waterbody Banks 7
- Requirements for Control of Water from Dewatering Operations 7
- Requirements for Sediment and Erosion Control 8
- Requirements for Spill Response and Reporting 8
- Environmental Monitoring Requirements and Responsibilities 9
- Conclusion 10
- References 11