Record of On-Site Meeting Broadway Drain and Healy Drain City of Windsor
- Date: 12 March 2015 2:00 p.m.
- Time: 2:00 p.m.
- Location: City of Windsor – 1266 McDougall
Attendance:
- Attendance: Dan Krutsch – Landmark Engineers Inc.
- Liz Michaud – Landmark Engineers Inc.
- Sandee Hrynyk – Brighton Beach Power Ltd.
- Jeremy Warnock – Dainty Foods Inc.
- Ed Clough – Essex Terminal Railway Co.
- Mark Seeger – Essex Terminal Railway Co.
- Peter Berry – Windsor Port Authority
- Lou Helmer – West Windsor Power
- Bill Bennett – WDBA
- Michael Mastronardi – Stantec Consulting
- Alain Michaud – Stantec Consulting
- Peter Vreman – Stantec Consulting
- Mark McCloskey – D.C. McCloskey Engineersing
- Mazin Mansour – Nemak Canada
- Marco Ricci – Nemak Canada
- Grant Switzer – Enwin Utilities
- Jonathan Werner – Parsons
- Stacey Shyshak – City of Windsor
- Anna Godo – City of Windsor
- Pascal Mongeau – WDBA/Transport Canada
- Francis Kennette – 1544929 Ontario Ltd. Brighton Beach Agg.
The following is a general summary of the items discussed at the above-noted meeting.
1.0 Review Agenda and Highlight Purpose of Meeting
The meeting agenda was presented and the purpose of the meeting was reviewed. The meeting intent was to provide information to all property owners and stakeholders in an open forum and obtain feedback on any drainage issues they may have. It was noted that the meeting was being held at the McDougall Street location for convenience, but that the Engineer would be happy to reconvene on-site if any owners preferred.
2.0 Present Brief History of the Subject Drains
A brief history of the subject drains and the need for improvement was presented. The Broadway and Healy Drains are municipal drains that were established under