MISCELLANEOUS PERMIT FEES AND CHARGES - CONTINUED
Permit Resubmission Fee(9)
1 Permit Resubmission – BEFORE permit is issued $212.00 per resubmission

2

Permit Resubmission – AFTER permit is issued
$212.00 per resubmission- Plus additional applicable permit fees(No refund will be issued on original permit)

3
Permit Resubmission – due to application found to be incomplete 25% of application fee per permit resubmission (Min $212.00)
Change of Use Permit
1 Change of Use Permit Fee (no construction required) $212.00- Plus additional applicable permit fees
Partial Occupancy Permit $ / Sq-Ft ($ / Sq-M)*
1 Partial Occupancy Permit Fee $0.05 ($0.54)* for the area(2) to be occupied (Min. $300.00)
Conditional Permit
1 Conditional Permit Fee Regular fee for complete building- Plus $1000.00 flat fee
Partial Permit
1 Partial Permit Fee Regular fee for complete building- Plus $500.00 flat fee per permit
Alternative Solution Application & Special / Supplementary Review Fee
1 Alternative Solution Application Fee (per application)
$300.00 minimum for up to 4 hours of review time plus $100.00 per hour beyond the first 4 hours
2 Special Research Request Fee
3 Supplementary Plans Review Fee
Inspection Fee
1 Inspection requested but the work is incomplete $100.00
2 Special inspection request (after-hours inspection) $500.00 minimum per inspection call
3 Inspection calls over the maximum two (2) inspections allowed for each stage of construction $100.00 per inspection call
Work Without a Permit Penalty Fee

1
Work without a permit – for projects commenced  prior to permit issuance 1.5 times the applicable maximum building permit fee (Min. $500.00 - Max. $5000.00)
Temporary Construction Water Service Fee (Collected for ENWIN - Water Division)
1 Residential $180.00
2 Industrial / Commercial / Institutional $300.00