ADDITIONAL PERMIT FEES - CONTINUED
Sewer & Water Permits Fee as indicated
 
House (OBC**: Part 9, Group C) (New, Alteration, and Second / Third Dwelling Unit)

All Other Group C occupancies as listed in the OBC** (New, Alteration)

Industrial / Commercial/ Institutional (OBC**: Groups A, B, D, E, F) (New, Alteration)
Post Disaster Buildings (as defined in Div. A, Article 1.4.1.2. of the OBC**(New, Alteration)
1 Sanitary Drainage Piping Servicing $195.00 per unit
$3.30 / Ft ($10.83 / M)* (Min. $212.00)

$3.30 / Ft ($10.83 / M)* (Min. $212.00)

$3.30 / Ft ($10.83 / M)* (Min. $212.00)
2 Storm Drainage Piping Servicing $245.00 per unit
3 Water Service Permit $75.00 per bldg

4
Storm Drainage Not Connected To A Building $3.30 / Ft ($10.83 / M)* plus $50.00 for each additional catch basin after the first catch basin (Min. $245.00)
Other Permit Types $ / Sq-Ft ($ / Sq-M)* unless otherwise indicated

1
Basement Floor Area (House – OBC**: Part 9, Group C) (New Construction)
$1.00 ($10.76)*(3) of the total basement floor area

2
Finished Basement Floor Area (House – OBC**: Part 9, Group C; not including Second / Third Dwelling Units) (New and Existing Construction) $0.50 ($5.38)*(4)- Plus applicable Mechanical and Plumbing Fees

3
Deck/Porch without a Roof (OBC**: Part 9, Group C) (New Construction)
$0.75 ($8.07)*(2) (Min. $240.00)

4
Accessory Buildings (OBC**: Part 9, Group C)(New Shed, Detached Garage, Pool House, etc.; not including Second / Third Dwelling Units) $0.75 ($8.07)*(2) (Min. $240.00)- Plus applicable Mechanical and Plumbing Fees

5

Mezzanine (All Types)
Fee charged is equal to the “Base Permit Fee” for the associated occupancy type- Plus applicable Mechanical and Plumbing Fees

6
Shell Permit for OBC**: Group A, B, D, E, F and Simple Group F (Industrial) Building(8) Occupancies $1.75 ($18.84)*(2)- Plus applicable Mechanical and Plumbing Fees

7
Interior Finishing (where only a Shell Permit was previously issued) $0.70 ($7.53)*(2)- Plus applicable Mechanical and Plumbing Fees

8
Projects and items not specifically listed in this Schedule for OBC**: Groups A, B, C, D, E and F Occupancies $15.00 per $1000.00 (or part thereof) of the estimated cost of the work(1)(6) (Min. $212.00)

MISCELLANEOUS PERMIT FEES AND CHARGES Note: Any fees listed below may be applicable individually or in addition to "General Application Fees", "Base Permit Fees", and "Additional Permit Fees". The proposed scope of work determines the applicability of "Miscellaneous Permit Fees and Charges".

Demolition Permit Fee $ / Sq-Ft ($ / Sq-M)*
1 Demolition Permit Fee (All Building Types) $0.15 ($1.61)*(2) (Min. $300.00)
Temporary Structures $ / Sq-Ft ($ / Sq-M)*
Temporary Building or Structure: Shall mean a seasonal building or structure designed, constructed and placed on the land in a manner that allows its removal after a period not to exceed 120 consecutive days. These structures do not meet the snow load requirements as set out in the Ontario Building Code.

1
Tents (Greater than 2,422 Sq-Ft (225 Sq-M) or, groupings of tents that are closer than 3 metres apart and have an aggregate ground area greater than 2,422 Sq-Ft (225 Sq-M))
$0.10 ($1.08)*(2) (Min. $250.00)