Interior demolition of gymnasium floor to repair footing and foundations, and restored (Photo credit: JP Thomson Architects).

Null

Finished brick restoration which preserved historic masonry and stopped water penetration into the gym.

949 Giles Blvd E – Prince Edward Public School Photos

NullNull

Initial excavation and finished re-pointed brick and concrete panels (Photo credit: JP Thomson Architects).

NullNull

Staggered brick removal/re-installation process around entire perimeter of the interior gym walls (Photo credit: JP Thomson Architects).