Interior demolition of gymnasium floor to repair footing and foundations, and restored (Photo credit: JP Thomson Architects).
Finished brick restoration which preserved historic masonry and stopped water penetration into the gym.
949 Giles Blvd E – Prince Edward Public School Photos
Initial excavation and finished re-pointed brick and concrete panels (Photo credit: JP Thomson Architects).
Staggered brick removal/re-installation process around entire perimeter of the interior gym walls (Photo credit: JP Thomson Architects).