EnWin Utilities – Hydro | No Objection, however, an easement named to ENWIN Utilities Ltd is required for the entire north/south alley between Drouillard Rd and Henry Ford Centre Dr, south of Richmond St as highlighted in red in the attached PDF. The easement will be required upon closing to accommodate the existing pole line with overhead 16.0kV primary distribution, 600/347V, 120/240V secondary distribution and all associated equipment running north south along the east side of the alley. ENWIN Utilities Ltd will also require uninterrupted access to maintain the existing overhead. Sketch attached for reference only. |
Windsor Utilities – Water | Has No Objections |
Union Gas | I can confirm that Union Gas Limited does not have any facility located within the proposed alley |
Legal Department | For land abutting properties zoned RD2.1, $1.00 plus deed preparation fee and proportionate share of the survey cost as invoiced to The Corporation of the City of Windsor by an Ontario Land Surveyor. For lands abutting properties zoned CD2.2, $4.50 per square foot without easements and $2.25 per square foot with easements plus deed preparation fee and proportionate share of the survey cost as invoiced to The Corporation of the City of Windsor by an Ontario Land Surveyor. Lands abutting City property should be retained for municipal purposes. |
OTHER: | |