THAT an additional $300,000 required to complete the project BE TRANSFERRED from the Reserve Fund F208 into Projects 7161023 – LRPCP Security and 7189008 – Security Entrances and Gates as per the Financial Matters section; and,
THAT if the $200,000 recommended in the 2020 8-Year Capital Budget in project ENV002-08 is not approved that additional funding of $200,000 required to fully fund the work also BE TRANSFERRED from the Reserve Fund 208 into Project 7161023 – LRPCP Secuirty.
Executive Summary:
N/A
Background:
The Pollution Control Department operates two wastewater treatment facilities. The Little River Pollution Control Plant (LRPCP) provides wastewater treatment for the east side of the city (east of Pillette Road) as well as Tecumseh and the Lou Romano Water Reclamation Plant (LRWRP) treats the wastewater received from the sewers west of Pillette Rd. including south Windsor as well as LaSalle. Both plants are maintained by a complement of operating and engineering staff. Both plants receive numerous visitors as well as deliveries and contracted companies throughout the day and sometimes at night. Access and egress at the plants are controlled by gates which have card access and intercom communications.
Administration is proposing to replace the main entrance automatic securi ty gates at both LRWRP and LRPCP.
Dillon Consulting Ltd provided engineering design services to the department in accordance with the Corporation's Engineering Rostering process and will provide the contract administration services for this construction project.
Due to extended project duration and unexpected complexity of the work, Dillon Consulting Ltd. is requesting additional fees for this project.
Administration is seeking to hire Rorison Electric Limited to complete the work for this project.
Discussion:
Discussion: Plant main gates are near 40 years old and frequent equipment malfunctions at the security gates are often causing the plant operators to hold the gates open for extended periods of time, which compromises the plant security.
The new plant entrances design takes into account the following principles:
- The new security gates must comply with all the applicable safety standards;