S-29
UTILITY CUTS RESTORATION
TABLE OF CONTENTS
-
29.01. SCOPE OF WORK ..................................................................................... 1
-
29.02. REFERENCES ........................................................................................... 1
-
29.03. DEFINITIONS ........................................................................................... 1
-
29.04. EXCAVATION AND REMOVAL ...................................................................... 2
-
29.05. BACKFILL REQUIREMENTS ......................................................................... 2
-
29.06. TEMPORARY SURFACE RESTORATION .......................................................... 2
-
29.07. STAMPING / STENCILLING TEMPORARY RESTORATIONS ................................ 3
-
29.08. PERMANENT SURFACE RESTORATION .......................................................... 3
29.01. SCOPE OF WORK
This specification covers the requirements for surface restoration following utility cuts completed under permit or Municipal consent.
29.02. REFERENCES
This specification refers to the following standards, specifications, or publications:
- S-24
29.03. DEFINITIONS
Hard Surface – Shall mean a pavement, curb, sidewalk, paved driveway, or any other structure constructed at or near the ground surface elevation.
Zone of Influence – Shall mean the area beneath a hard surface and shall include the area enclosed by a plane extending outward at a 1:1 slope, down from the surface edge of a hard surface.
Utility Cut – Shall mean any opening or cut into a hard surface to access buried plant in the public right-of-way.
Road Condition Rating – Shall mean the road condition rating as assigned by the City Engineer.