Figure 2: Riverside Drive Vista Improvement Project Approved Design (IPS: Intersection
Pedestrian Signal)
Figure 3: Typical N-2 Node, Riverside Drive Vista Improvement Project
Detailed design for Phase 2A of the project (Ford Boulevard to St. Rose Avenue) is currently underway with construction planned for 2022-2024.
Detailed design for Phase 3A (Strabane Avenue to Ford Boulevard) is planned to commence in 2024 with construction planned for 2026-2028.