The architectural plans for Fire Station No. 7 were reused together with the same consultant project team. Certain building features were mirror images.
-
The building appearance for Fire Station No. 5 varies slightly from the design of the previous stations. While it was in part a cost-saving measure, a more natural brick was selected for the fire station that recalls the natural environment surrounding the station.
-
Bedroom quarters for Fire Station No. 5 are first to incorporate solid partition walls.
-
A naturalized stormwater drainage disposal area was created in the northwest quadrant of the Fire Station No. 5 site. It was expanded during construction to further reduce environmental impact and to better integrate with existing habitat.
-
Fire Station No. 2 can accommodate two trucks while Fire Station No. 5 can accommodate three trucks on site.
-
Fire Station No. 5 bedrooms have additional privacy, with sliding doors and block walls separating sleeping quarters.
-
Rubberized flooring for indoor areas has been installed in lieu of