THE CORPORATION OF THE CITY OF WINDSOR PROCEDURE
Service Area: | Office of the City Solicitor | Procedure No.: | |
Department: | Planning and Building Services | Approval Date: | |
Division: | Transportation Planning | Approved By: | |
Effective Date: | On approval | ||
Subject: | Vision Zero Procedure | Policy Ref.: | |
Pages: 4 | Replaces: N/A | ||
Prepared By: | J. Hagan | Date: N/A |
1. PURPOSE
- 1.1.This procedure is intended to provide details for implementation of the Vision Zero Policy.
2. SCOPE
- 2.1.This policy provides the details of how Vision Zero is to be implemented for the Corporation.
3. RESPONSIBILITY
- 3.1. Responsibility for implementing this procedure is outlined in the Vision Zero Policy.
4. PROCEDURE
-
4.1. The Vision Zero Action Plan shall:
-
4.1.1. Identify a target date to achieve the goal of zero fatal and serious injury collisions on City of Windsor roads.
-
4.1.2. Identify strategic priorities in order to achieve this goal.
-
4.1.3. Identify initiatives to achieve each strategic priority, including the person or position that has primary responsibility for carrying out the initiative.
-
4.1.4. Develop an implementation plan, including interim goals for each initiative.
Interim goals should be specific, measurable, and have an identified date.
-
4.1.5. Incorporate the Vision Zero foundational elements identified by the Vision Zero Network:
-
4.1.5.1. A robust data framework,
-
4.1.5.2. Measurable goals with a clear timeline for implementation.
-
4.1.5.3. Accountability, and
-
4.1.5.4. Transparency,
-
-
- 4.2. Consultation with the Vision Zero Stakeholder Group should occur at the following points, at minimum: