APPENDIX “C”

CONSULTATIONS

SAA/5612

Agency Comments
   
Fire and Rescue Services No objections
Windsor Police Services The proposed alley closure will have no negative impact on public safety whatsoever so the Windsor Police Service has no concerns or objections with the application.
Planning – Landscape Architect No Objections
Parks & Facilities No Objections
Public Works – Engineering The subject alley closure is approximately 3.50m (11.50ft) wide, appears to be untraveled. Operations and Right- of-Way would prefer that the closer extend to the south end of 1797 Huron Church. There are no municipal sewers or manholes located within the closure. There appears to be hydro poles within the closure and an easement will be required for utilities. There is a shed and fence encroaching within the closure. There is no driveway access within the closure. This alley appears to serve no useful purpose by CR146/2005; therefore we have no objections to the closure of this alley.
Public Works – Environmental No concerns
Public Works – Transportation No objections.
Transit Windsor  
Bell Canada Easement required as per Schedule.
Cogeco Cable Systems Inc. No Concerns
Canada Post No concerns
Rogers Communications  
Telus Communications TELUS has no infrastructure in the area of your proposed work. Permit expires six(6) months from approval date
MNSi  
EnWin Utilities – Hydro Hydro EngineeringNo Objection, however, an easement for the entire alley named to EnwinUtilities Ltd. is required upon alley closing to accommodate existing120/240 volt overhead hydro distribution
Windsor Utilities – Water No Objection
Union Gas I confirm that Union Gas Limited does not have any facility located within the proposed alley closing.
Legal Department For lands abutting RD 1.2 the conveyance price is $1.00. Should any portion be conveyed to a commercially zonedparcel (ie 1797 Huron Church Road), the conveyance price is set at market value as determined by the Manager ofReal Estate Services.
   
OTHER: