Telus Communications

TELUS has no infrastructure in the area of your proposed work. Permit expires six(6) months from approval date.

MNSi

No comments received.

EnWin Utilities

– Hydro

No objection to alley closing, however, an easement named to Enwin Utilities Ltd., is required for the entire N/S alley upon closing to accommodate existing 120/240 volt overhead hydro distribution.

Windsor Utilities

– Water

Water Engineering has no objections.

Enbridge

Please note that Enbridge Gas has active infrastructure in the proposed area. Enbridge Gas requires a minimum separation of 0.3m from all of our plant. Please ensure that this minimum separation requirement is maintained, and that the contractor obtains locates prior to performing any work and utilizes safe excavation practices while performing any work in the vicinity. Easement required.

Legal Department

For alleys abutting lands zoned RD1.3: $1.00, plus deed preparation, plus proportionate survey costs. For alleys abutting lands zoned MD1.1: $117.22 per square metre.