ENWIN UTILITIES - Hydro Engineering – Cecile Dalgleish, August 21, 2020

No Objection, provided clearances are achieved and maintained from our distribution plant.

Please note ENWIN has the following distribution around the development property:

  1. Overhead 27.6KV primary distribution and 120/240V secondary distribution along the east side of the development property

  2. Overhead 120/240V secondary street light distribution along the south side of Wyandotte St E

An acceptable clearance must be maintained from our existing pole lines and conductors to the proposed development area. Please refer to the Ontario Building Code for adequate clearance requirements. We also recommend referring to the Occupational Health & Safety Act for the minimum safe limits of approach during construction.

Sketch attached for reference only. This attachment does not replace the need for utility locates.

ENWIN UTILITIES - Water Engineering – Cecile Dalgleish, August 21, 2020

No objections