Agency Comments
Fire and Rescue Services No concerns on closure from WFRS John Lee Prevention OfficerChief Fire
Windsor Police Services The Windsor Police Service has no concerns or objections with the closure being requested. Specifically, the outcome from the closure of this particular alley will not inhibit or diminish proper police emergency response capability or general patrol activities to the area in any way.
Planning – Landscape Architect No objection from a landscape architectural perspective.
Parks & Facilities No Issues Or Objections To SAA/6064
Public Works – Engineering The subject alley closure is approximately 4.27m (14ft) wide, and composed of grass. There are no sewers, manholes, or catchbasins located in the alley closure. There are wooden hydro poles, guy-wires, or overhead wires located in the alley. An easement will be required for utilities. There is a variety of fences encroaching the subject alley. This alley appears to serve no useful purpose by CR146/2005; therefore, we have no objections to the closure of this alley.
Public Works – Environmental No concerns from Environmental Services.
Public Works – Transportation Alley off of Beals is fenced off and not accessible. Alley at north end from Liberty is fenced off half its width to the south side of 333 Liberty, at which point it is fenced off and not accessible. Alley is not serving any purpose to pedestrians or vehicles. Support the full closure of the alley as proposed. Mike Spagnuolo – Traffic Operations.
Transit Windsor No response received.
Bell Canada Bell Canada requests an easement over the entire alley, or a strip 3.0m wide; 1.5m on either side of the facilities for the length of the alley.
Cogeco Cable Systems Inc. No response received.
Canada Post No response received.
Rogers Communications No response received.
Telus Communications TELUS has no infrastructure in the area of your proposed work. Permit expires six(6) months from approval date.
MNSi MNSi will require an aerial easement through the subject lands
EnWin Utilities– Hydro Hydro Engineering: No Objection to closing the alley, however, an easement named to EnWin Utilities is required for the entire area to accommodate existing poles and 120/240V secondary distribution.
Windsor Utilities– Water Water Engineering has No Objections
Union Gas Our records indicate we have no active infrastructure in the area identified in the document. Therefore we have no concerns.
Legal Department For lands abutting properties zoned RD1.4, $1.00 plus deed preparation fee and proportionate share of the survey cost