Appendix ‘C’ – Consultations Table
Agency | Comments |
---|---|
Fire and Rescue Services | No concerns on closure from WFRS. John Lee – Chief Fire Prevention Officer |
Windsor Police Services | The Windsor Police Service has no concerns or objections with the closure being requested. Specifically, the outcome from the closure of this particular alley will not inhibit or diminish proper police emergency response capability or general patrol activities to the area in any way. |
Planning – Landscape Architect | There is a significant number of trees on the properties immediately to the east of the closure that will be impacted by any development by the application. There does not appear to be any significant to impact to trees or future bikeways by the requested alley closure. Therefore, there are no objections to the application from a Landscape Architectural perspective. |
Parks & Facilities | No objections or comments. |
Public Works – Engineering | The subject alley closure is approximately 4.27m (14ft) wide, and is composed of grass. There are no sewers, manholes, or catchbasins located in the alley closure. There are wooden hydro poles, guy-wires, or overhead wires located in the alley. An easement will be required for utilities. This alley appears to serve no useful purpose by CR146/2005; therefore, we have no objections to the closure of this alley. |
Public Works – Environmental | No concerns from Environmental Services |
Public Works – Transportation | Alley is not currently used for pedestrian or vehicular access.No concerns with closing the alley as proposed. MikeSpagnuolo – Traffic Operations. |
Transit Windsor | No response received. |
Bell Canada | Bell Canada requests an easement over the entire alley, or a 3.0m wide strip, 1.5m on either side of the aerial facilities for the length of the alley. |
Cogeco Cable Systems Inc. | No response received. |
Canada Post | No response received. |
Rogers Communications | No response received. |
Telus Communications | TELUS has no infrastructure in the area of your proposed work. Permit expires six(6) months from approval date. |
MNSi | MNSi will require and aerial easement through this entire alley closing |
EnWin Utilities– Hydro | No objection, however, an easement named to ENWIN Utilities Ltd. is required for the entire north/south alley upon closing to accommodate existing overhead 120/240 volt hydro distribution, poles and down guy wires. |
Windsor Utilities– Water | Water Engineering has no objections. |
Union Gas | Our records indicate we have no active infrastructure in the area identified in the document. Therefore we have no concerns. |